JP WHYTEDECORATORS 07377 812846Get a quote
School decorating in Nantwich

Stapeley Broad Lane CofE Primary School Decorating Project

Classroom and ceiling redecoration at Stapeley Broad Lane CofE Primary School in Nantwich, with careful surface preparation and a consistent finish throughout the project.

Stapeley Broad Lane CofE Primary School main entrance sign in Nantwich
Project overview

Classroom and ceiling redecoration, planned as one programme.

JP Whyte Decorators completed the preparation and redecoration of two classrooms at Stapeley Broad Lane CofE Primary School in Nantwich. The work included the classroom walls and ceilings, with repairs and surface preparation completed before the final coatings.

The photographs show the classroom walls and ceilings before and after redecoration, including the ceiling surfaces around access panels, ventilation and lighting. The completed work brings a clean, consistent finish to the school interiors.

LocationNantwich, Cheshire
SettingPrimary school
AreasClassrooms and ceilings
EvidencePreparation and completed photographs
Finished first classroom after decorating in Nantwich
Classroom one completedThe panelled walls, brickwork and ceiling were brought together in a clean, consistent finish.
Before and after

Preparation and completed classroom finishes.

Explore photographs of the preparation and completed finish in both classrooms. Move each divider to compare the stages.

BeforePanelled wall in classroom one before final decoration
AfterPanelled wall in classroom one after decorating

Classroom one panelled wall

Preparation and a consistent final coating across the detailed wall surface.

BeforeClassroom one window wall before final painting
AfterClassroom one window wall after painting

Classroom one window wall

The finished wall sits cleanly around the windows, radiator and fixed services.

BeforeClassroom two window wall during preparation
AfterClassroom two window wall after decorating

Classroom two window wall

Visible preparation and previous wall markings replaced by a clean completed finish.

BeforeClassroom two end wall before decoration
AfterClassroom two end wall after decoration

Classroom two end wall

The brick surface was prepared before the room received its final light finish.

Ceiling preparation & redecoration

Nantwich school ceilings: before and after.

These ceiling works formed part of the same Stapeley Broad Lane CofE Primary School project. The photographs show the original surface condition alongside the completed white finish, including the access panels, ventilation grille and suspended lighting.

Ceiling and access panel

The original surface and the completed white finish around the central access panel.

Before
School ceiling around the access panel before preparation and repainting
After
School ceiling around the access panel after white repainting

Ceiling around the ventilation grille

The before and after photographs show the change from visible surface defects to a consistent painted finish.

Before
Cracked and uneven ceiling surface around the ventilation grille before decorating
After
Completed white ceiling around the ventilation grille at the Nantwich school

Ceiling beside the suspended lighting

Preparation and redecoration bring a clean finish across the ceiling and surrounding details.

Before
Ceiling surface beside the suspended light fitting before redecoration
After
Repainted school ceiling beside the suspended light fitting
Completed classrooms

Additional finished views.

Wide completed view of classroom one in Nantwich
Classroom one overviewA wide view across the prepared and redecorated teaching space.
Completed door wall in classroom one
Classroom one door wallThe finished wall around the door, boards and fixed services.
Completed window wall in classroom two
Classroom two windowsA completed view along the window and radiator wall.
Wide completed view of classroom two at Stapeley school
Classroom two overviewThe second room after preparation and redecoration.
Planning school decorating

Preparation and programme matter as much as the final colour.

Classroom projects need a clear scope, sensible protection and a reliable handover date. This Nantwich project shows how two separate teaching spaces were progressed as one coordinated programme.

We work with schools and organisations across Nantwich and Cheshire to agree the scope, access arrangements and decorating programme before work begins.

Call nowFree quote